PC inverter connection kit 2
For controlling and commissioning an inverter directly from a PC, if the STARTER commissioning tool 1) has been installed on the PC. With this, the inverter can be
-
parameterized (commissioning, optimization)
-
monitored (diagnostics)
-
controlled (master control via the STARTER commissioning tool 1) for test purposes)
A USB cable (3 m/9.84 ft) is included in the scope of delivery.
The PC inverter connection kit 2 is suitable for the following SINAMICS G120 Control Units:
-
CU230P‑2 HVAC
-
CU230P‑2 DP
-
CU230P‑2 PN
-
CU240E‑2
-
CU240E‑2 DP
-
CU240E‑2 PN
-
CU240E‑2 F
-
CU240E‑2 DP‑F
-
CU240E‑2 PN‑F
-
CU250S‑2
1) The STARTER commissioning tool is also available on the Internet at
https://support.industry.siemens.com/cs/document/26233208